Federal Energy Regulatory Commission Issues First Pilot License for Tidal Power Project in New York City’s East River

By Federal Energy Regulatory Commission

The project, owned by Verdant Power and known as the Roosevelt Island Tidal Energy (RITE) Project, is 1,050-kilowatts and uses the East River’s natural tidal currents to generate electricity. Turbine generator units are mounted on the riverbed and capture energy from the tidal flow. The pilot license issued to Verdant Power is for 10 years.

Read more at Federal Energy Regulatory Commission

Advertisement
Post a comment or leave a trackback: Trackback URL.

Comments

  • offshore bank account  On January 31, 2012 at 12:07 am

    has been running a prototype project in the East River between Queens and Roosevelt Island in New York City; it was the first major tidal-power project in the United States.

Trackbacks

  • By Homepage on January 29, 2012 at 1:21 am

    … [Trackback]…

    [...] Read More: baseloadgeneration.wordpress.com/2012/01/27/federal-energy-regulatory-commission-issues-first-pilot-license-for-tidal-power-project-in-new-york-citys-east-river/ [...]…

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.